Dialynas
STORES
About the project
The building consists of the ground floor which is divided into two parts, one part will be used for the production of plastic tanks, and the other part will be used for technical testing and analysis. Above the section of technical testing &
analysis there are three floors with office use, the communication of the floors with the ground floor (uncovered space) is through 2 internal staircases.
The supervision and construction was carried out by our team.
It included crew coordination, material orders etc.